The roads around the University of British Columbia (UBC) pose maintenance challenges. Many are very old and in poor condition due to shallow pavement structures, poor subgrades, and tree root infestations. In addition to high commuter traffic, University Boulevard handles over 300 transit buses per day and is one of the main entry points to the UBC campus.
Typically, full depth pavement repairs have been performed in summer months to repair failed sections of the highway. In this case, given the time of year was December, the maintenance contractor decided to use EZ Street® to provide a temporary patch until final repairs could be made. The repairs involved milling the surface to a depth of 50mm and 75mm. EZ Street asphalt was then laid over the area. Weather during the repair was cold (2 degrees Celsius) with drizzle and rain throughout the day.
These patches were expected to hold through the wet Vancouver winter, eliminating the need for pothole repairs until May, when final repairs could be completed. To date, the EZ Street® patches are 100% intact, with the expectation that they will now be left as enduring repairs. Further EZ Street® paving is now being planned as an enduring solution at more UBC locations.